{"id":2156,"date":"2025-07-18T07:43:27","date_gmt":"2025-07-18T06:43:27","guid":{"rendered":"https:\/\/dhwnews.com\/?p=2156"},"modified":"2025-07-23T19:08:50","modified_gmt":"2025-07-23T18:08:50","slug":"multiple-timber-footbridge-failure-draft-hypothesis","status":"publish","type":"post","link":"https:\/\/dhwnews.com\/?p=2156","title":{"rendered":"The causes of multiple timber footbridge failure.  Who is going to pay?"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1925\" src=\"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-300x200.jpg 300w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-1024x683.jpg 1024w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-768x512.jpg 768w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-1536x1024.jpg 1536w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-2048x1365.jpg 2048w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-850x567.jpg 850w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Ashford Lane footbridge collapsed &#8211; June 2025.<\/p>\n<figure id=\"attachment_2123\" aria-describedby=\"caption-attachment-2123\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2123\" src=\"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/07\/IMG_8590-300x200.jpg\" alt=\"Black Potts footbridge 15-7-2025\" width=\"300\" height=\"200\" srcset=\"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/07\/IMG_8590-300x200.jpg 300w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/07\/IMG_8590-1024x683.jpg 1024w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/07\/IMG_8590-768x512.jpg 768w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/07\/IMG_8590-1536x1024.jpg 1536w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/07\/IMG_8590-2048x1365.jpg 2048w, https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/07\/IMG_8590-850x567.jpg 850w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-2123\" class=\"wp-caption-text\">Black Potts footbridge closed &#8211; July 2025<\/figcaption><\/figure>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-297\" src=\"https:\/\/dhwnews.com\/wp-content\/uploads\/2023\/10\/IMG_5678-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/dhwnews.com\/wp-content\/uploads\/2023\/10\/IMG_5678-300x200.jpg 300w, https:\/\/dhwnews.com\/wp-content\/uploads\/2023\/10\/IMG_5678-1024x683.jpg 1024w, https:\/\/dhwnews.com\/wp-content\/uploads\/2023\/10\/IMG_5678-768x512.jpg 768w, https:\/\/dhwnews.com\/wp-content\/uploads\/2023\/10\/IMG_5678-1536x1024.jpg 1536w, https:\/\/dhwnews.com\/wp-content\/uploads\/2023\/10\/IMG_5678-2048x1365.jpg 2048w, https:\/\/dhwnews.com\/wp-content\/uploads\/2023\/10\/IMG_5678-850x567.jpg 850w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Berry Hill footbridge closed &#8211; October 2023<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-984\" src=\"https:\/\/dhwnews.com\/wp-content\/uploads\/2024\/06\/IMG_6400-300x200.jpg\" alt=\"Partially replaced footbridge\" width=\"300\" height=\"200\" srcset=\"https:\/\/dhwnews.com\/wp-content\/uploads\/2024\/06\/IMG_6400-300x200.jpg 300w, https:\/\/dhwnews.com\/wp-content\/uploads\/2024\/06\/IMG_6400-1024x683.jpg 1024w, https:\/\/dhwnews.com\/wp-content\/uploads\/2024\/06\/IMG_6400-768x512.jpg 768w, https:\/\/dhwnews.com\/wp-content\/uploads\/2024\/06\/IMG_6400-1536x1024.jpg 1536w, https:\/\/dhwnews.com\/wp-content\/uploads\/2024\/06\/IMG_6400-2048x1365.jpg 2048w, https:\/\/dhwnews.com\/wp-content\/uploads\/2024\/06\/IMG_6400-850x567.jpg 850w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Berry Hill footbridge partially replaced June 2024<\/p>\n<p>This is my (assisted by AI) hypothesis &#8211; on <span style=\"color: #ff0000;\"><strong>the primary causes of short life and premature failure of timber footbridges over the Jubilee River and thereabouts<\/strong><\/span> in the Thames Catchment area.\u00a0 Sadly, the potential collapse of these timber footbridges is inevitable and a direct consequence of multiple shortcomings.\u00a0 <strong>My point is that &#8211; today &#8211; those who should be accountable (the EA) fail to learn &#8211; and are not required to pay.<\/strong><\/p>\n<p><strong><span style=\"color: #ff0000;\">CONCLUSION<\/span><\/strong><\/p>\n<p>It is my view that <strong><span style=\"color: #ff0000;\">a comprehensive review of current practices and implementation of improved standards across all phases of timber footbridge delivery from concept onwards IS ESSENTIAL in order to break this cycle of premature failure. Passing the problem around is not a solution. Somebody somewhere needs to be accountable &#8211; and to pay.<\/span><\/strong><\/p>\n<p><strong><span style=\"color: #ff0000;\">INTRODUCTION<\/span><\/strong><br \/>\nThe Thames catchment area, particularly around the Jubilee River, has witnessed a concerning pattern of premature failure among timber footbridges. Notable examples include the Temple, Berry Hill, Ashford Lane, The Myrke, and Black Potts footbridges. There are others. These structures, designed to provide essential pedestrian access across waterways, have consistently failed to achieve their intended design life, resulting in safety concerns, recurring replacement costs, and disruption to public access and the flood defence function of land drainage infrastructure.\u00a0\u00a0<strong><span style=\"color: #ff0000;\">In my opinion even the replacement of the centre section of the Berry Hill footbridge needs to be re-examined.<\/span><\/strong><br \/>\nThis article presents my hypothesis that the shortened lifespan of these timber footbridges results from a combination of interconnected factors that compound to accelerate structural deterioration and compromise safety.<\/p>\n<p><strong><span style=\"color: #ff0000;\">Rather than single-point failures, these timber footbridges suffer from systemic issues that begin at the design stage and persist throughout their operational life until they fail.<\/span><\/strong><\/p>\n<p><span style=\"color: #ff0000;\"><strong>THE PRIMARY CAUSES OF FAILURE<\/strong><\/span><\/p>\n<p>1. <strong><span style=\"color: #ff0000;\">POOR DESIGN<\/span><\/strong><br \/>\nThe foundation of any successful bridge lies in its design, yet many of these timber footbridges exhibit fundamental design flaws. Common issues include inadequate consideration of local environmental conditions, insufficient allowance for thermal expansion and contraction, water ingress and poor drainage integration. The design phase often fails to account for the specific challenges posed by the Thames catchment environment, including seasonal extremes, high humidity, and variable orientation and ground conditions.<br \/>\nFurthermore, structural designs can underestimate loading requirements, particularly dynamic loads from pedestrian traffic and loading during storms. The interconnection details between timber members often lack proper consideration for differential movement, leading to stress concentrations and premature joint failure.<br \/>\n2. <strong><span style=\"color: #ff0000;\">INCORRECT MATERIAL SELECTION<\/span><\/strong><br \/>\nMaterial selection represents a critical decision point where many projects falter. The choice of timber species, treatment methods, and hardware specifications directly impacts longevity. Many installations utilize softwood species that, while economical, lack the durability required for exposed external conditions in a high-moisture environment.<br \/>\nThe selection of inappropriate fasteners, brackets, and connection hardware compounds the problem. Steel components without adequate corrosion protection accelerate deterioration through galvanic action and rust staining. Additionally, the use of timber grades unsuitable for structural applications or external exposure conditions significantly reduces service life.<br \/>\n3. <strong><span style=\"color: #ff0000;\">SUB-STANDARD MATERIALS<\/span><\/strong><br \/>\nEven when appropriate materials are specified, the actual materials delivered and installed often fall short of requirements. The longitudinal grain structure of beams and girders is particularly important. Timber may be inadequately seasoned, leading to excessive movement and splitting. Preservative treatments may be incomplete or applied to timber with excessive moisture content, reducing penetration and effectiveness. Quality control during material procurement appears insufficient, with inadequate verification of treatment levels, grading stamps, and moisture content. This results in the installation of materials that are fundamentally compromised from the outset, regardless of design adequacy or construction quality.<br \/>\n4. <span style=\"color: #ff0000;\"><strong>SUB-STANDARD MANUFACTURING<\/strong><\/span><br \/>\nThe manufacturing and fabrication phase represents a critical stage where design intent must be translated into physical reality. However, many timber footbridge components suffer from poor manufacturing standards that compromise structural integrity from the outset. Common manufacturing deficiencies include inadequate quality control during cutting and shaping operations, resulting in dimensional inaccuracies and poor surface finishes.<br \/>\nWith the joint design already questionable, joint preparation can lack the precision required for proper load transfer, with inadequate tolerances and poor assembly of connections. The prevention of water ingress is a critical consideration in timber construction. Pre-drilling of bolt holes may be executed without proper alignment, creating stress concentrations and reducing connection capacity. The fabrication environment may lack adequate protection from weather, allowing moisture ingress during construction that compromises preservative treatments and dimensional stability. Factory-produced components can arrive on site with inadequate protective coatings or with damage sustained during transport and handling. The lack of proper packaging and handling procedures during manufacturing and delivery exposes treated timber to moisture and physical damage, negating the benefits of preservative treatment before installation even begins.<br \/>\n5. <span style=\"color: #ff0000;\"><strong>LACK OF MAINTENANCE<\/strong><\/span><br \/>\nTimber structures in external environments require regular maintenance to achieve their design life. However, maintenance programs for these footbridges appear inadequate or non-existent. Regular cleaning, re-treatment of surfaces, replacement of worn components, and adjustment of hardware are essential but frequently neglected.<br \/>\nThe absence of proactive maintenance allows minor issues to develop into major structural problems. Surface treatments that protect against moisture ingress are allowed to degrade, hardware loosens without retightening, and drainage systems become blocked. This reactive rather than proactive approach significantly accelerates deterioration thus shortening life.<br \/>\n6. <strong><span style=\"color: #ff0000;\">SUB-STANDARD INSPECTION<\/span><\/strong><br \/>\nEffective inspection regimes are crucial for identifying emerging problems before they become critical. However, inspection procedures for these footbridges often lack rigour, frequency, or technical competence. Inspections may be conducted by personnel <strong><span style=\"color: #ff0000;\">without appropriate timber engineering knowledge or the appropriate equipment,<\/span><\/strong> thus leading to the misinterpretation or failure to identify conditions and inadequate risk assessment.<\/p>\n<p>It is possible that the lack of standardized inspection criteria and <strong><span style=\"color: #ff0000;\">centralised and shared documentation systems<\/span><\/strong> prevents the accumulation of meaningful condition data over time. This makes it impossible to identify deterioration trends or predict remaining service life accurately, leading to reactive rather than planned interventions <strong><span style=\"color: #ff0000;\">and the potential for partial or inappropriate solutions and further waste &#8211; e.g. Berry Hill footbridge centre section replacement in 2024.<\/span><\/strong><\/p>\n<p><strong><span style=\"color: #ff0000;\">THE COMPOUNDING EFFECT<\/span><\/strong><br \/>\nThese factors do not operate in isolation but rather compound each other&#8217;s effects. Poor design creates conditions where material deficiencies become more critical. Sub-standard manufacturing compromises structural integrity regardless of material quality. Inadequate maintenance accelerates the impact of material selection errors. Sub-standard inspections fail to identify problems that could be addressed before they become critical.<\/p>\n<p><span style=\"color: #ff0000;\"><strong>The result is a cascade of ever-accelerating deterioration that progresses more rapidly than would occur with any single factor alone.<\/strong><\/span><\/p>\n<p>This explains why these footbridges consistently fail to achieve their intended design life and why replacement rather than repair becomes the only viable option.<\/p>\n<p><strong><span style=\"color: #ff0000;\">MANAGEMENT FAILURES<\/span><\/strong><br \/>\n<strong><span style=\"color: #ff0000;\">The premature failure of timber footbridges over the Jubilee River and surrounding Thames catchment area results from a systemic management failure across geo-political boundaries, multiple disciplines and project phases.<\/span><\/strong><\/p>\n<p><strong><span style=\"color: #ff0000;\">Addressing this issue requires a holistic approach that ensures design adequacy, appropriate material selection and quality, controlled manufacturing and fabrication standards, proper construction practices, proactive maintenance, competent inspection regimes and shared data.<\/span><\/strong><br \/>\nOnly by addressing the contributing factors simultaneously can future timber footbridge projects achieve their intended design life and provide reliable, safe pedestrian access across the waterways of the Thames catchment.<br \/>\n<strong><span style=\"color: #ff0000;\">The current pattern of repeated failure and replacement is neither sustainable, cost-effective or safe, and represents a missed opportunity to provide durable infrastructure that serves the community effectively.<\/span><\/strong><br \/>\nThe evidence from Temple, Berry Hill, Ashford Lane, The Myrke, Black Potts and other footbridges demonstrates that piecemeal approaches to individual aspects of bridge provision and maintenance are insufficient.<br \/>\n<strong><span style=\"color: #ff0000;\">A comprehensive review of current practices and implementation of improved standards across all phases of timber footbridge delivery from concept onwards is essential to break this cycle of premature failure. Passing the problem around is not a solution. Somebody somewhere needs to be accountable.<\/span><\/strong><br \/>\nEND<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ashford Lane footbridge collapsed &#8211; June 2025. Berry Hill footbridge closed &#8211; October 2023 Berry Hill footbridge partially replaced June 2024 This is my (assisted by AI) hypothesis &#8211; on the primary&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[1],"tags":[173,38,159,197,99,177,179,195,196],"class_list":["post-2156","post","type-post","status-publish","format-standard","hentry","category-uncategorized","tag-ashford-lane-footbridge","tag-berry-hill-footbridge","tag-black-potts-footbridge","tag-jubilee-river-footbridges","tag-temple-footbridge","tag-the-myrke-footbridge","tag-timber-footbridge-failure","tag-timber-footbridge-inspection","tag-timber-footbridge-maintenance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The causes of multiple timber footbridge failure. Who is going to pay? - DHWNEWS<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dhwnews.com\/?p=2156\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The causes of multiple timber footbridge failure. Who is going to pay? - DHWNEWS\" \/>\n<meta property=\"og:description\" content=\"Ashford Lane footbridge collapsed &#8211; June 2025. Berry Hill footbridge closed &#8211; October 2023 Berry Hill footbridge partially replaced June 2024 This is my (assisted by AI) hypothesis &#8211; on the primary...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dhwnews.com\/?p=2156\" \/>\n<meta property=\"og:site_name\" content=\"DHWNEWS\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-18T06:43:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-23T18:08:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ecwlarcombe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ecwlarcombe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156\"},\"author\":{\"name\":\"ecwlarcombe\",\"@id\":\"https:\\\/\\\/dhwnews.com\\\/#\\\/schema\\\/person\\\/2f696cd1eb9c322931f8d0e39fdf8017\"},\"headline\":\"The causes of multiple timber footbridge failure. Who is going to pay?\",\"datePublished\":\"2025-07-18T06:43:27+00:00\",\"dateModified\":\"2025-07-23T18:08:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156\"},\"wordCount\":1320,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dhwnews.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/IMG_8361-300x200.jpg\",\"keywords\":[\"Ashford Lane footbridge\",\"Berry Hill Footbridge\",\"Black Potts footbridge\",\"Jubilee River footbridges\",\"Temple footbridge\",\"the Myrke footbridge\",\"timber footbridge failure\",\"timber footbridge inspection\",\"timber footbridge maintenance\"],\"articleSection\":[\"Uncategorized\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/dhwnews.com\\\/?p=2156#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156\",\"url\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156\",\"name\":\"The causes of multiple timber footbridge failure. Who is going to pay? - DHWNEWS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dhwnews.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/IMG_8361-300x200.jpg\",\"datePublished\":\"2025-07-18T06:43:27+00:00\",\"dateModified\":\"2025-07-23T18:08:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dhwnews.com\\\/?p=2156\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156#primaryimage\",\"url\":\"https:\\\/\\\/dhwnews.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/IMG_8361-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/dhwnews.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/IMG_8361-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dhwnews.com\\\/?p=2156#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dhwnews.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The causes of multiple timber footbridge failure. Who is going to pay?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dhwnews.com\\\/#website\",\"url\":\"https:\\\/\\\/dhwnews.com\\\/\",\"name\":\"DHWNEWS\",\"description\":\"Datchet, Horton &amp; Wraysbury News\",\"publisher\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dhwnews.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/dhwnews.com\\\/#organization\",\"name\":\"DHWNEWS\",\"url\":\"https:\\\/\\\/dhwnews.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/dhwnews.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/dhwnews.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/dhwlogo1.png?fit=357%2C334&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/dhwnews.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/dhwlogo1.png?fit=357%2C334&ssl=1\",\"width\":357,\"height\":334,\"caption\":\"DHWNEWS\"},\"image\":{\"@id\":\"https:\\\/\\\/dhwnews.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dhwnews.com\\\/#\\\/schema\\\/person\\\/2f696cd1eb9c322931f8d0e39fdf8017\",\"name\":\"ecwlarcombe\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0ec4f2fe12dab3e1b48c39a4b0633913d283908bffb9e52165186f1dc7fcee8d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0ec4f2fe12dab3e1b48c39a4b0633913d283908bffb9e52165186f1dc7fcee8d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0ec4f2fe12dab3e1b48c39a4b0633913d283908bffb9e52165186f1dc7fcee8d?s=96&d=mm&r=g\",\"caption\":\"ecwlarcombe\"},\"url\":\"https:\\\/\\\/dhwnews.com\\\/?author=1\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The causes of multiple timber footbridge failure. Who is going to pay? - DHWNEWS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dhwnews.com\/?p=2156","og_locale":"en_GB","og_type":"article","og_title":"The causes of multiple timber footbridge failure. Who is going to pay? - DHWNEWS","og_description":"Ashford Lane footbridge collapsed &#8211; June 2025. Berry Hill footbridge closed &#8211; October 2023 Berry Hill footbridge partially replaced June 2024 This is my (assisted by AI) hypothesis &#8211; on the primary...","og_url":"https:\/\/dhwnews.com\/?p=2156","og_site_name":"DHWNEWS","article_published_time":"2025-07-18T06:43:27+00:00","article_modified_time":"2025-07-23T18:08:50+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-scaled.jpg","type":"image\/jpeg"}],"author":"ecwlarcombe","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ecwlarcombe","Estimated reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dhwnews.com\/?p=2156#article","isPartOf":{"@id":"https:\/\/dhwnews.com\/?p=2156"},"author":{"name":"ecwlarcombe","@id":"https:\/\/dhwnews.com\/#\/schema\/person\/2f696cd1eb9c322931f8d0e39fdf8017"},"headline":"The causes of multiple timber footbridge failure. Who is going to pay?","datePublished":"2025-07-18T06:43:27+00:00","dateModified":"2025-07-23T18:08:50+00:00","mainEntityOfPage":{"@id":"https:\/\/dhwnews.com\/?p=2156"},"wordCount":1320,"commentCount":0,"publisher":{"@id":"https:\/\/dhwnews.com\/#organization"},"image":{"@id":"https:\/\/dhwnews.com\/?p=2156#primaryimage"},"thumbnailUrl":"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-300x200.jpg","keywords":["Ashford Lane footbridge","Berry Hill Footbridge","Black Potts footbridge","Jubilee River footbridges","Temple footbridge","the Myrke footbridge","timber footbridge failure","timber footbridge inspection","timber footbridge maintenance"],"articleSection":["Uncategorized"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/dhwnews.com\/?p=2156#respond"]}]},{"@type":"WebPage","@id":"https:\/\/dhwnews.com\/?p=2156","url":"https:\/\/dhwnews.com\/?p=2156","name":"The causes of multiple timber footbridge failure. Who is going to pay? - DHWNEWS","isPartOf":{"@id":"https:\/\/dhwnews.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dhwnews.com\/?p=2156#primaryimage"},"image":{"@id":"https:\/\/dhwnews.com\/?p=2156#primaryimage"},"thumbnailUrl":"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-300x200.jpg","datePublished":"2025-07-18T06:43:27+00:00","dateModified":"2025-07-23T18:08:50+00:00","breadcrumb":{"@id":"https:\/\/dhwnews.com\/?p=2156#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dhwnews.com\/?p=2156"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/dhwnews.com\/?p=2156#primaryimage","url":"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-scaled.jpg","contentUrl":"https:\/\/dhwnews.com\/wp-content\/uploads\/2025\/06\/IMG_8361-scaled.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/dhwnews.com\/?p=2156#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dhwnews.com\/"},{"@type":"ListItem","position":2,"name":"The causes of multiple timber footbridge failure. Who is going to pay?"}]},{"@type":"WebSite","@id":"https:\/\/dhwnews.com\/#website","url":"https:\/\/dhwnews.com\/","name":"DHWNEWS","description":"Datchet, Horton &amp; Wraysbury News","publisher":{"@id":"https:\/\/dhwnews.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dhwnews.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/dhwnews.com\/#organization","name":"DHWNEWS","url":"https:\/\/dhwnews.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/dhwnews.com\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/dhwnews.com\/wp-content\/uploads\/2022\/10\/dhwlogo1.png?fit=357%2C334&ssl=1","contentUrl":"https:\/\/i0.wp.com\/dhwnews.com\/wp-content\/uploads\/2022\/10\/dhwlogo1.png?fit=357%2C334&ssl=1","width":357,"height":334,"caption":"DHWNEWS"},"image":{"@id":"https:\/\/dhwnews.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/dhwnews.com\/#\/schema\/person\/2f696cd1eb9c322931f8d0e39fdf8017","name":"ecwlarcombe","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/0ec4f2fe12dab3e1b48c39a4b0633913d283908bffb9e52165186f1dc7fcee8d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0ec4f2fe12dab3e1b48c39a4b0633913d283908bffb9e52165186f1dc7fcee8d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0ec4f2fe12dab3e1b48c39a4b0633913d283908bffb9e52165186f1dc7fcee8d?s=96&d=mm&r=g","caption":"ecwlarcombe"},"url":"https:\/\/dhwnews.com\/?author=1"}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/dhwnews.com\/index.php?rest_route=\/wp\/v2\/posts\/2156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dhwnews.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dhwnews.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dhwnews.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dhwnews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2156"}],"version-history":[{"count":11,"href":"https:\/\/dhwnews.com\/index.php?rest_route=\/wp\/v2\/posts\/2156\/revisions"}],"predecessor-version":[{"id":2179,"href":"https:\/\/dhwnews.com\/index.php?rest_route=\/wp\/v2\/posts\/2156\/revisions\/2179"}],"wp:attachment":[{"href":"https:\/\/dhwnews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2156"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dhwnews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2156"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dhwnews.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}