Another section of the Ashford Lane timber footbridge has collapsed into the Jubilee River. The south span collapsed last year and the central span has now failed.

Below – this is the Black Potts footbridge on 9/7/2026. Closed to pedestrians since June 2025 – how long before this ends up in the Jubilee River?

Some structural detail below:

A message to the Authorities: You have already had a year to dismantle this failed structure! I suspect that you have run out of time.

