Full marks for the Sunnymeads Bridge (between Wraysbury and Horton) resurfacing and relining. Now if the traffic lights could be repaired – and were visible – that would be a bonus. Sadly…
Four years on and still waiting for action on the Wraysbury Drain!
‘Riparian Responsibilities for the Wraysbury Drain’ was a letter to residents (dated 5th August 2020) published and distributed by RBWM. Here we are – four years on – and still waiting for…
Riparian ownership guide
Riparian Ownership: A basic guide to owning and managing a watercourse. This easy-to-read and very helpful guide is produced by Calderdale Council and can be found (as a .pdf) at The Flood…
RBWM Excuses – Not fixing the Wraysbury Drain for five years
Please see below some of the RBWM excuses for delaying/failing to fix the Wraysbury Drain for over five years: RBWM – ‘We have already spent about £200,000 and failed to fix the…
Wraysbury Drain Petition – RBWM Council Meeting – 17/7/2024
The ten page RBWM Report on Flood Defence Equality contains a warning (S5 – Legal Implications) to some local riparian owners. According to the report ‘Liability otherwise sits with the landowners responsible…
Oxford Flood Alleviation Scheme approved 15-7-2024
The Oxford Flood alleviation Scheme received planning approval on 15-7-2024. The Oxford flood alleviation scheme will cost around £176 million and take about five years to complete. Further information can be found here
General Election Results – Whitehaven and Workington (i.e. Andrew Johnson)
The Whitehaven and Workington 2024 General Election results are of interest to the residents of RBWM because former RBWM Council Leader Andrew Johnson was a candidate there. Labour gain from Conservative and…
FINISHED – Hustings for General Election – Windsor Constituency (D,H&W Ward) – 2 July 2024
NOW FINISHED 2-7-2024 7.00pm Datchet You can still view the Windsor Hustings 2024 event (at The Old Court) on YouTube A hustings is a meeting where election candidates or…
Berry Hill Footbridge (Taplow) reopened but….?
Berry Hill Footbridge (Jubilee River Bridge Number 2) on the Thames Path has been closed for years. The centre section of the wooden bridge has now been replaced with a steel bridge….