Berry Hill Footbridge is being replaced at a cost of about £350,000. Link to previous report hereWhat you actually see here is the partially assembled new foot bridge mounted on a temporary sub-frame that is sitting on pontoons. When complete – the foot bridge will be floated to and fixed in its final position about 100m down stream before the sub-frame and pontoons are removed.